Text

For Arbon Energie AG, we completed the planning, tendering and realization of a redundant drinking water pumping station to ensure an emergency water supply for Arbon. The newly installed pump in the Water Treatment Plant (WTP) Frasnacht has a capacity of up to 18,000 m3/d and is operated with a variable-frequency drive, enabling a flexible adaptation to various operating conditions. The increase in capacity also entailed replacing the existing air-contacted pressure shock absorber with a new membrane pressure shock absorber.

Text

Our services

  • General planning of phases SIA 21 to SIA 53 (Swiss Society of Engineers and Architects)
  • Hydraulic dimensioning
  • Planning of a new frequency-regulated pump with a delivery range of 250-750 m3/h, 107 mWS and an enhanced system efficiency of ≤ 85% (IE 4) 
  • Shock absorber with bladder and forced flow 5120l, horizontal
  • Connecting pipes (DN 300, PN 16, 40 m) 
  • Fittings 
  • Integration into the digital control systems of the WTP Frasnacht and the WTP Arbon (remote control)