Text

We drafted and implemented a plan for the installation of photovoltaic systems totaling 144 kWp for four apartment buildings at the former Zellweger industrial site on Weiherweg in Uster. Our work ranged from the completion of a needs analysis to planning and tendering to implementation support. The value added for the developers and residents includes a customer-friendly power supply model, use of a sustainable and cost-efficient energy source, as well as the resulting increased attractiveness of the properties.

Text

Our services

  • Drafting a demand analysis; assessment of the potential, costs and profitability
  • Evaluating solar power procurement and billing models ((ZEV (merger for personal consumption) model, VNB (distribution system operator) model, feedback model))
  • Designing, dimensioning and planning of the four photovoltaic systems on the site
  • Preparing the tender documents and carrying out the tender
  • Evaluating the bids
  • Providing implementation support through acceptance and handover of the operation