Text

Swiss Federal Railways (SBB) is planning a 30-km tunnel link between Aarau and Zurich. The planned tunnel, emergency stop, technical centers, and access structures are situated in solid rock and in loose rock containing ground water. In the preliminary study, we design an optimal route and plan the complex integration points as well as all the required structures. Careful planning of the structures, installation areas, material management and compliance with environmental law are crucial for the approvability.

Our services

  • Assessing alternative project designs
  • Project authoring for engineering: tunnel system, emergency station, tunnel safety, construction and maintenance access points; planning construction; estimating costs
  • Involving all relevant SBB specialist services and project planners for adjacent sections
  • Involving all stakeholders, including cantonal and municipal agencies
  • Managing materials; planning construction logistics; elaborating the tunneling concept
  • Environmental planning and sustainability