Text

Stisa AG operates a logistics hub in Ticino, home to several logistics companies, including Swiss Post with its regional distribution center. As the transition to electric mobility gains momentum, not only Swiss Post but also other operators are increasingly electrifying their fleets, leading to a growing number of e-trucks. To support this shift, Stisa plans to establish a fast-charging hub. We guided Stisa through the entire process—from the feasibility study to operational implementation—ensuring a demand-driven charging infrastructure, a crucial step in decarbonizing heavy goods transport.

Our services

  • Conducting a feasibility study, including a profitability analysis and selection of the most suitable solution
  • Projekt management
  • Supporting the client and representing them in dealings with grid operator and technology providers
  • Conducting the tender for the charging infrastructure and evaluating the offers
  • Integrating the charging infrastructure into the site's energy concept, with a focus on maximizing the use of photovoltaic-generated electricity
  • Supporting the selection of operational solutions (billing, pricing, etc.)