Text

Effretikon Train Station has various shortcoming and does not meet all of the requirements of the Swiss Disabilities Act. By removing the existing track 4, a good solution that meets all the requirements has been found, with a new pedestrian underpass and the widening of the two central platforms. The structural measures require extensive adjustments to the entire station: tracks, platforms, all entrances and the bicycle crossing must be redesigned.

Text

Our services

  • Elaborating all civil engineering and engineering structures including route construction, underground cable construction and drainage together with the necessary auxiliary construction measures
  • Coordinating with the relevant departments of Swiss Federal Railways (SBB)
  • Providing support for developing the track project plan
  • Designing the new platform facilities for tracks 1 to 5, including the respective platform accessways
  • Planning the new central pedestrian underpass with a width of eights meters
  • Drafting the construction plan for the new pedestrian underpass and the Rosenweg bicycle crossing
  • Construction phase planning
     
Text

Images: Effretikon Train Station in 2022
Picture Credits: © EBP, Salem Blum