EDR Group (now EBP) conducted an analysis to assess the feasibility of deploying new DC fast-charging stations on MassDOT property to support long-distance travel for zero-emissions vehicles (ZEVs) across Massachusetts.
The study included an assessment of the electric vehicle market in Massachusetts and the identification of future scenarios for DCFC infrastructure demand using a fleet evolution model to estimate energy needs. Later tasks focused on major travel corridors that long-distance travel, including work to: